Jump to content
Urch Forums

Work Rate Question


dekardar

Recommended Posts

I cant seem to get my head around these questions.Can somebody please provide a detailed explanation of these questions?

 

1.Pump A can empty a pool in 8 minutes.Pump B can empty a pool in 6 minutes.Pump A pumps the pool for 2 minutes before pump B joins in.How may minutes will it take to empty the pool together?

2.Working alone jerry can complete a work in 6 minutes.Working alone ,Adam can complete a work in 8 minutes.Working together,Jerry leaves the work after 2 minutes.How long will it take Adam to complete the work?

 

Thanks.

Link to comment
Share on other sites

Assuming the pool has a capacity of X (whatever the unit is), pump A take out X/8 every minute, and pump B can take out X/6 every minute.

 

Pump A does the work for 2 minutes first, and take out X/4 in the first 2 minutes, 3X/4 left in the pool

 

Pump A and B will take out (X/8) + (X/6) = 7X/24 combined every minute

 

(3X/4) / (7X/24) = 18/7 minutes

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...